Industrial manufacturing

Redesigning a plant network for margin, not volume

Result

+31%

In short

Operating margin improvement in eighteen months after a plant-network redesign.

Client

Family-owned group · 1,200 staff

Factory floor with industrial machinery

The challenge

Five plants, three of them under-utilised, and a board that had tolerated falling margins for four years because volume kept growing. The owners wanted to know whether the network still made sense.

Our approach

We rebuilt the cost-to-serve model product by product, then tested three network options with the plant managers in the room. The chosen option closed one site, specialised two and moved forty product lines.

The outcome

Operating margin rose from 6.2% to 8.1% within eighteen months. Service levels held throughout the transition, and no customer was lost to the consolidation.

Facing a similar decision?

Talk it through with a partner.